Cleaning the bottom of the water area
Bottom cleaning objectives
Complex cleaning of the water area bottom is aimed at search and extraction of undesirable objects, usually located in the coastal zone. They include both non-dangerous remains of different objects, constructions, domestic and construction waste, stumps, logs, snags, scrap metal and explosive objects of industrial or military use. Water area cleaning works are required in the following cases:- if there is suspicion of explosive objects (EOD) underwater;
- before laying underwater utility routes, as well as when repairing them;
- in the construction of structures partially placed below water level
- before the beginning of the beach season or the expansion of existing beach boundaries.
Stages of clearing and demining the water area
Cleaning the bottom of the water area (demining) includes:- an on-board sonar and magnetometer survey of the area to determine the presence of large objects and metal accumulations underwater;
- detailing of the ground with probe metal detectors and mapping of detected objects with satellite transmitters;
- diving for direct visual examination of the bottom, collecting small debris and fixing the large to lift it mechanically. If there are explosive objects in the water area they are demined directly on the spot or remotely detonated
- Drawing up a report on the conducted diving survey and bottom cleaning.
Drawing up an act of inspection and cleaning of the water area
The act of diving survey and cleaning of the water area bottom is drawn up on the basis of the technical assignment and the initial data for the works. The act is drawn up after the survey and cleaning of the seabed for foreign objects (including BOP) have been carried out and the results meet all the necessary requirements. The prepared document is approved by all relevant authorities.Preliminary cost of works on the survey and cleanup of the water area from VOP
Area: | Cost: |
---|---|
Per 1 Hectare | From 22 000 rubles |
Per 10 Hectare | От 200 000 rubles |
Per 100 Hectare | От 1 850 000 rubles |
Performed work on sites
2nd QUARTER OF 2024
; 2nd quarter 2024 In the period from April to June, specialists of the Center for Humanitarian Demining and Special Works conducted a survey of the area for the presence of explosive objects
1st QUARTER OF 2024
; 1st quarter 2024 In the period from January to March, specialists of the Center for Humanitarian Demining and Special Works conducted a survey of the area for the presence of explosive objects
3 QUARTER 2023
; Q3 2023 In the period from July to September 2023, specialists of the Center for Humanitarian Demining and Special Works conducted a survey of the area for the presence of explosive objects
4 QUARTER 2023
; Q4 2023 In the period from October to December 2023, specialists of the Center for Humanitarian Demining and Special Works conducted a survey of the area for the presence of explosive objects
2 QUARTER 2023
; Q2 2023 In the period from April to June 2023, specialists from the Center for Humanitarian Demining and Special Works surveyed the area for the presence of explosive ordnance (EO) as part
1 QUARTER 2023
; Q1 2023 In the period from January to March 2023, specialists from the Center for Humanitarian Demining and Special Works surveyed the area for the presence of explosive ordnance (ED) as part
4 QUARTER 2022
; Q4 2022 In the period from October to December 2022, specialists from the Center for Humanitarian Demining and Special Works surveyed the area for the presence of explosive ordnance (EO) as part
3 QUARTER 2022
; Q3 2022 In the period from July to September 2022, specialists of the Center for Humanitarian Demining and Special Works carried out an explosive ordnance survey (EOD) as part of the implementation
2 QUARTER 2022
; Q2 2022 In the period from April to June 2022, specialists of the Center for Humanitarian Demining and Special Works made a survey of the territory for the presence of explosive hazards
1 QUARTER 2022
; Q1 2022. In the period from January to March 2022, specialists from the Center for Humanitarian Demining and Special Works surveyed the area for the presence of explosive ordnance (EO) as part
4 QUARTER 2021
; Q4 2021. In the period from October to December 2021, specialists of the Center for Humanitarian Demining and Special Works made a survey of the territory for the presence of explosive hazards
3 QUARTER 2021
; Q3 2021. In the period from July to September 2021, specialists of the Center for Humanitarian Demining and Special Works carried out a survey of the area for the presence of explosive
2 QUARTER 2021
; Q2 2021. In the period from April to June 2021, specialists of the Center for Humanitarian Demining and Special Works made a survey of the area for explosive ordnance (EOD) in the
1 QUARTER 2021
; Q1 2021. In the period from January to March 2021 specialists of the Center for Humanitarian Demining and Special Works made a survey of the territory for the presence of explosive hazards
4 QUARTER 2020
; Q4 2020. In the period from October to December 2020 specialists of the Center for Humanitarian Demining and Special Works made a survey of the area for explosive ordnance (EOD) in the
3 QUARTER 2020
; Q3 2020. In the period from July to September 2020, specialists of the Center for Humanitarian Demining and Special Works carried out a survey of the area for explosive ordnance (EOD) in
2 QUARTER 2020
; Q2 2020. In the period from April to June 2020, specialists of the Center for Humanitarian Demining and Special Works carried out a survey of the area for explosive ordnance (EOD) in
1 QUARTER 2020
; Q1 2020. In the period from January to March 2020, specialists of the Center for Humanitarian Demining and Special Works carried out a survey of the area for explosive ordnance (EOD) as
4 QUARTER 2019
; Q4 2019. During the period from October to December 2019, specialists of the Center for Humanitarian Demining and Special Works made a survey of the area for explosive ordnance (EOD) as part
3 QUARTER 2019
; Q3 2019. During the period from July to September 2019, specialists of the Center for Humanitarian Demining and Special Works made a survey of the area for explosive ordnance (EOD) in the
2 QUARTER 2019
; Q2 2019. During the period from April to June 2019, specialists of the Center for Humanitarian Demining and Special Works carried out a survey of the area for explosive ordnance (EOD) as
1 QUARTER 2019
; Q1 2019. During the period from January to March 2019, specialists of the Center for Humanitarian Demining and Special Works conducted a survey of the area for explosive ordnance (EOD) as part