In the period from July to September 2023, specialists of the Center for Humanitarian Demining and Special Works conducted a survey of the area for the presence of explosive objects (VOP) as part of the fulfillment of contractual obligations on the territory:
Stavropol Territory, Shpakovsky district, land plots for the construction of facilities included in the construction of the Gazprom gas pipeline facilities:
![](https://cgrsr.ru/wp-content/uploads/2024/01/659f721fad08a_1-1024x768.jpg)
![](https://cgrsr.ru/wp-content/uploads/2024/01/659f6d3707875_1.2-1024x768.jpg)
![](https://cgrsr.ru/wp-content/uploads/2024/01/659f6d372a126_1.3-1024x768.jpg)
![](https://cgrsr.ru/wp-content/uploads/2024/01/659f6d36d79a6_1.4-1024x768.jpg)
The Republic of Karelia and the Leningrad Region, territories for the design of reconstruction, capital repairs and construction of facilities included in the construction of the Gazprom gas pipeline facilities:
![](https://cgrsr.ru/wp-content/uploads/2024/01/659f6d3693285_1.5.jpg)
![](https://cgrsr.ru/wp-content/uploads/2024/01/659f6d3693a9b_1.6.jpg)
![](https://cgrsr.ru/wp-content/uploads/2024/01/659f6d36a03a0_1.7.jpg)
![](https://cgrsr.ru/wp-content/uploads/2024/01/659f6d37001f1_1.8.jpg)
![](https://cgrsr.ru/wp-content/uploads/2024/01/659f6d38e40e2_1.9-1024x768.jpg)
![](https://cgrsr.ru/wp-content/uploads/2024/01/659f70a7c9356_1.10-1024x768.jpg)
![](https://cgrsr.ru/wp-content/uploads/2024/01/659f715e89d8f_1.11-1024x768.jpg)
![](https://cgrsr.ru/wp-content/uploads/2024/01/659f6d388d080_1.12-768x1024.jpg)
Saratov region, Saratov, sections of the water area allocated for the design and further construction of a new road bridge:
![](https://cgrsr.ru/wp-content/uploads/2024/01/659f6d3740501_1.13.jpg)
![](https://cgrsr.ru/wp-content/uploads/2024/01/659f6d377b647_1.14.jpg)
![](https://cgrsr.ru/wp-content/uploads/2024/01/659f6d37ea3c6_1.15-1024x768.jpg)
Novgorod region, Novgorodsky district, land plots for the construction of facilities included in the construction of the Gazprom PJSC gas pipeline:
![](https://cgrsr.ru/wp-content/uploads/2024/01/659f6d37e57cc_1.16.jpg)
![](https://cgrsr.ru/wp-content/uploads/2024/01/659f6d37f2b74_1.17.jpg)
![](https://cgrsr.ru/wp-content/uploads/2024/01/659f6d38b950c_1.18-1024x768.jpg)
![](https://cgrsr.ru/wp-content/uploads/2024/01/659f6d38ed66b_1.19-1024x768.jpg)
Leningrad region, Vyborgsky district, areas of the territory allocated for the construction of projected communication towers:
![](https://cgrsr.ru/wp-content/uploads/2024/01/659f71a2db7c9_1.20-768x1024.jpg)
![](https://cgrsr.ru/wp-content/uploads/2024/01/659f71e54f7ad_1.21-768x1024.jpg)
![](https://cgrsr.ru/wp-content/uploads/2024/01/659f721f01c47_1.22.jpg)
![](https://cgrsr.ru/wp-content/uploads/2024/01/659f721f0274f_1.23.jpg)
Murmansk region, Kola district, sections of the territory allocated for the reconstruction of the highway:
![](https://cgrsr.ru/wp-content/uploads/2024/01/659f721f0ca76_1.24.jpg)
![](https://cgrsr.ru/wp-content/uploads/2024/01/659f721f07560_1.25.jpg)
![](https://cgrsr.ru/wp-content/uploads/2024/01/659f766c9fbab_1.26-1024x768.jpg)
![](https://cgrsr.ru/wp-content/uploads/2024/01/659f721f0f9ab_1.27.jpg)
![](https://cgrsr.ru/wp-content/uploads/2024/01/659f72d572cbd_1.28.jpg)
![](https://cgrsr.ru/wp-content/uploads/2024/01/659f72d55fa46_1.29.jpg)
![](https://cgrsr.ru/wp-content/uploads/2024/01/659f72d55cb79_1.30.jpg)
![](https://cgrsr.ru/wp-content/uploads/2024/01/659f72203baba_1.31-1024x768.jpg)
The total area of the surveyed sites was: 1513.5 hectares.
The number of explosive objects detected (VOP) is 18 units.