In the period from July to September 2021, specialists of the Center for Humanitarian Demining and Special Works carried out a survey of the area for the presence of explosive hazards (EOD) as part of the contractual obligations in the territory:
Primorsky Krai, Partizansky District, land plots of stages 1 and 2 of the gas pipeline construction from the gas distribution station Bolshoy Kamen to the gas distribution station Vrangel:
![](https://cgrsr.ru/wp-content/uploads/2021/10/8-1.jpg)
![](https://cgrsr.ru/wp-content/uploads/2021/10/photo_2021-10-03_17-30-20-576x1024.jpg)
![](https://cgrsr.ru/wp-content/uploads/2021/10/photo_2021-10-03_20-18-22-576x1024.jpg)
Primorsky Krai, Shkotovsky District, land plots of stages 3 and 4 of the construction of a gas pipeline from the Bolshoi Kamen gas distribution station to the Vrangel gas distribution station:
![](https://cgrsr.ru/wp-content/uploads/2021/10/img_1307.jpg)
![](https://cgrsr.ru/wp-content/uploads/2021/10/img_1303.jpg)
![](https://cgrsr.ru/wp-content/uploads/2021/10/photo_2021-10-03_17-30-38-1.jpg)
![](https://cgrsr.ru/wp-content/uploads/2021/10/img_1312.jpg)
Republic of Karelia, Belomorsky District:
![](https://cgrsr.ru/wp-content/uploads/2021/10/img_1514.jpg)
Smolensk region, Roslavlsky district, land plots for the construction of Power Units 1 and 2 of the Smolensk Nuclear Power Plant:
![](https://cgrsr.ru/wp-content/uploads/2021/10/photo_2021-10-13_16-43-10.jpg)
![](https://cgrsr.ru/wp-content/uploads/2021/10/photo_2021-10-13_16-46-55.jpg)
Tula and Kaluga regions, the area for the design of facilities for reconstruction, overhaul and construction of Transneft JSC:
![](https://cgrsr.ru/wp-content/uploads/2021/10/444.jpg)
![](https://cgrsr.ru/wp-content/uploads/2021/10/111.jpg)
Yaroslavl region, Gavrilov-Yamsky district, the area for the design of facilities for reconstruction, overhaul and construction of Transneft JSC:
![](https://cgrsr.ru/wp-content/uploads/2021/10/888.jpg)
![](https://cgrsr.ru/wp-content/uploads/2021/10/555.jpg)
The total area of the surveyed plots was: 512.9 Hectares.
Number of detected explosive objects (EOI) – 5 units.